ESPR deadline checker · free, no sign-up

How much time is left until your DPP deadline?

Pick your product group and see it straight away: the deadline, the legal basis, whether the date is fixed or expected – plus a reverse roadmap with concrete windows for your preparation.

Pick your product group

Choose your product group

One click shows you the deadline, the legal basis, how much time is left and a reverse roadmap with concrete preparation windows.

Electronics: dishwashers (start of the staggered rollout)

Deadline: Starting Legal basis: Energy label carry-over

Dishwashers open the electronics rollout: their product data moves into the passport via the energy label carry-over. There is no single calendar date for it – the rollout is staggered by design.

DPP for electronics & appliances
Time remaining (estimate) 2026 Deadline Estimate

No exact calendar date has been published for this milestone. The countdown therefore uses 1 July of the year shown as a deliberate, clearly flagged assumption, and reports years and months only – never a day-precise deadline.

Your reverse roadmap to the deadline

  1. 1  –  12–18 months before

    Confirm whether you are in scope, analyse data gaps, brief your suppliers.

  2. 2  –  6–12 months before

    Collect and validate material, origin and evidence data for every article.

  3. 3  –  Up to the deadline

    Publish DPP pages, add QR codes to labels and packaging, establish a maintenance process.

Ban on destroying unsold textiles and footwear (large companies)

Deadline: Fixed Legal basis: ESPR, Art. 25

From this date large companies may no longer destroy unsold textiles and footwear. It is not yet a DPP obligation, but it is the first fixed ESPR date that hits the textile sector directly – and a clear signal about the passport requirements to come.

DPP for textile companies
Time remaining 19 July 2026 Deadline

Your reverse roadmap to the deadline

  1. 1  –  12–18 months before

    Confirm whether you are in scope, analyse data gaps, brief your suppliers.

  2. 2  –  6–12 months before

    Collect and validate material, origin and evidence data for every article.

  3. 3  –  Up to the deadline

    Publish DPP pages, add QR codes to labels and packaging, establish a maintenance process.

Batteries: EV, industrial (over 2 kWh) and LMT batteries (e-bikes, e-scooters)

Deadline: Fixed – first hard DPP deadline Legal basis: EU Battery Regulation 2023/1542

The first genuinely hard Digital Product Passport deadline, and it comes from the EU Battery Regulation rather than the ESPR. E-bike and e-scooter brands are in scope too, because their packs count as LMT batteries. This date is fixed to the day.

Digital battery passport for e-bikes & cells
Time remaining 18 February 2027 Deadline

Your reverse roadmap to the deadline

  1. 1  –  12–18 months before

    Confirm whether you are in scope, analyse data gaps, brief your suppliers.

  2. 2  –  6–12 months before

    Collect and validate material, origin and evidence data for every article.

  3. 3  –  Up to the deadline

    Publish DPP pages, add QR codes to labels and packaging, establish a maintenance process.

Textiles and apparel (including footwear)

Deadline: Expected Legal basis: ESPR, delegated act

Textiles sit at the top of the ESPR work plan. The delegated act is expected in 2027 under current planning; the obligation becomes binding once it is adopted, plus the transition period. For data collection across a branched textile supply chain that is little lead time.

DPP for textile companies
Time remaining (estimate) 2027 (expected) Deadline Estimate

No exact calendar date has been published for this milestone. The countdown therefore uses 1 July of the year shown as a deliberate, clearly flagged assumption, and reports years and months only – never a day-precise deadline.

Your reverse roadmap to the deadline

  1. 1  –  12–18 months before

    Confirm whether you are in scope, analyse data gaps, brief your suppliers.

  2. 2  –  6–12 months before

    Collect and validate material, origin and evidence data for every article.

  3. 3  –  Up to the deadline

    Publish DPP pages, add QR codes to labels and packaging, establish a maintenance process.

Tires

Deadline: Expected Legal basis: ESPR, delegated act

Tires belong to the first ESPR wave, with the delegated act expected in 2027. Material composition, rolling resistance, mileage and recycled content will be the data that matters.

DPP for tires
Time remaining (estimate) 2027 (expected) Deadline Estimate

No exact calendar date has been published for this milestone. The countdown therefore uses 1 July of the year shown as a deliberate, clearly flagged assumption, and reports years and months only – never a day-precise deadline.

Your reverse roadmap to the deadline

  1. 1  –  12–18 months before

    Confirm whether you are in scope, analyse data gaps, brief your suppliers.

  2. 2  –  6–12 months before

    Collect and validate material, origin and evidence data for every article.

  3. 3  –  Up to the deadline

    Publish DPP pages, add QR codes to labels and packaging, establish a maintenance process.

Repairability requirements for electronics

Deadline: Expected Legal basis: ESPR (horizontal)

The ESPR provides for horizontal repairability requirements for electronics – rules that are not tied to a single product group. They are expected to take effect from 2027, putting spare part, disassembly and repair information into the passport.

DPP for electronics & appliances
Time remaining (estimate) 2027 (expected) Deadline Estimate

No exact calendar date has been published for this milestone. The countdown therefore uses 1 July of the year shown as a deliberate, clearly flagged assumption, and reports years and months only – never a day-precise deadline.

Your reverse roadmap to the deadline

  1. 1  –  12–18 months before

    Confirm whether you are in scope, analyse data gaps, brief your suppliers.

  2. 2  –  6–12 months before

    Collect and validate material, origin and evidence data for every article.

  3. 3  –  Up to the deadline

    Publish DPP pages, add QR codes to labels and packaging, establish a maintenance process.

Furniture

Deadline: Expected Legal basis: ESPR, delegated act

Furniture is an ESPR priority, with the delegated act expected in 2028. Building material, origin and recycling data now spreads the work over several years instead of compressing it into a deadline project.

DPP for furniture
Time remaining (estimate) 2028 (expected) Deadline Estimate

No exact calendar date has been published for this milestone. The countdown therefore uses 1 July of the year shown as a deliberate, clearly flagged assumption, and reports years and months only – never a day-precise deadline.

Your reverse roadmap to the deadline

  1. 1  –  12–18 months before

    Confirm whether you are in scope, analyse data gaps, brief your suppliers.

  2. 2  –  6–12 months before

    Collect and validate material, origin and evidence data for every article.

  3. 3  –  Up to the deadline

    Publish DPP pages, add QR codes to labels and packaging, establish a maintenance process.

Electronics: refrigeration appliances and EV chargers

Deadline: Planned Legal basis: Energy label carry-over

Stage two of the electronics rollout: refrigeration appliances and EV chargers are planned to follow in 2028 via the energy label carry-over. Again, no fixed calendar date has been published.

DPP for electronics & appliances
Time remaining (estimate) 2028 (planned) Deadline Estimate

No exact calendar date has been published for this milestone. The countdown therefore uses 1 July of the year shown as a deliberate, clearly flagged assumption, and reports years and months only – never a day-precise deadline.

Your reverse roadmap to the deadline

  1. 1  –  12–18 months before

    Confirm whether you are in scope, analyse data gaps, brief your suppliers.

  2. 2  –  6–12 months before

    Collect and validate material, origin and evidence data for every article.

  3. 3  –  Up to the deadline

    Publish DPP pages, add QR codes to labels and packaging, establish a maintenance process.

Mattresses

Deadline: Expected Legal basis: ESPR, delegated act

For mattresses the delegated act is expected in 2029. The sector sells heavily direct to consumers, so the passport becomes a sales argument at the point of sale, not just a compliance chore.

DPP for mattresses
Time remaining (estimate) 2029 (expected) Deadline Estimate

No exact calendar date has been published for this milestone. The countdown therefore uses 1 July of the year shown as a deliberate, clearly flagged assumption, and reports years and months only – never a day-precise deadline.

Your reverse roadmap to the deadline

  1. 1  –  12–18 months before

    Confirm whether you are in scope, analyse data gaps, brief your suppliers.

  2. 2  –  6–12 months before

    Collect and validate material, origin and evidence data for every article.

  3. 3  –  Up to the deadline

    Publish DPP pages, add QR codes to labels and packaging, establish a maintenance process.

Toys (the DPP replaces the declaration of conformity)

Deadline: Fixed (transition period running) Legal basis: EU Toy Regulation 2025/2509

For toys the passport comes from the EU Toy Regulation 2025/2509 rather than the ESPR – and it replaces the existing declaration of conformity. The regulation itself is settled; the obligation applies once the transition period ends, around 2030.

DPP for toys
Time remaining (estimate) approx. 2030 Deadline Estimate

No exact calendar date has been published for this milestone. The countdown therefore uses 1 July of the year shown as a deliberate, clearly flagged assumption, and reports years and months only – never a day-precise deadline.

Your reverse roadmap to the deadline

  1. 1  –  12–18 months before

    Confirm whether you are in scope, analyse data gaps, brief your suppliers.

  2. 2  –  6–12 months before

    Collect and validate material, origin and evidence data for every article.

  3. 3  –  Up to the deadline

    Publish DPP pages, add QR codes to labels and packaging, establish a maintenance process.

Electronics: smartphones and tablets

Deadline: Planned Legal basis: Energy label carry-over

The last known stage of the electronics rollout: smartphones and tablets are planned to enter the passport in 2030 via the energy label carry-over.

DPP for electronics & appliances
Time remaining (estimate) 2030 (planned) Deadline Estimate

No exact calendar date has been published for this milestone. The countdown therefore uses 1 July of the year shown as a deliberate, clearly flagged assumption, and reports years and months only – never a day-precise deadline.

Your reverse roadmap to the deadline

  1. 1  –  12–18 months before

    Confirm whether you are in scope, analyse data gaps, brief your suppliers.

  2. 2  –  6–12 months before

    Collect and validate material, origin and evidence data for every article.

  3. 3  –  Up to the deadline

    Publish DPP pages, add QR codes to labels and packaging, establish a maintenance process.

All DPP deadlines 2026–2030 at a glance

The complete timeline for every product group – regardless of which one you selected above.

All DPP deadlines 2026–2030 at a glance
DeadlineProduct groupLegal basisStatus
2026Electronics: dishwashers (start of the staggered rollout)Energy label carry-overStarting
19 July 2026Ban on destroying unsold textiles and footwear (large companies)ESPR, Art. 25Fixed
18 February 2027Batteries: EV, industrial (over 2 kWh) and LMT batteries (e-bikes, e-scooters)EU Battery Regulation 2023/1542Fixed – first hard DPP deadline
2027 (expected)Textiles and apparel (including footwear)ESPR, delegated actExpected
2027 (expected)TiresESPR, delegated actExpected
2027 (expected)Repairability requirements for electronicsESPR (horizontal)Expected
2028 (expected)FurnitureESPR, delegated actExpected
2028 (planned)Electronics: refrigeration appliances and EV chargersEnergy label carry-overPlanned
2029 (expected)MattressesESPR, delegated actExpected
approx. 2030Toys (the DPP replaces the declaration of conformity)EU Toy Regulation 2025/2509Fixed (transition period running)
2030 (planned)Electronics: smartphones and tabletsEnergy label carry-overPlanned

Based on current EU planning. For ESPR product groups the years indicate when the delegated act is expected to take effect. The obligation becomes binding once the act is adopted, plus a transition period of usually 18 months. This page is an orientation aid and does not replace legal advice.

How to read the ESPR deadlines

The Digital Product Passport does not arrive all at once but sector by sector – and not every year carries the same weight. This context helps you plan a realistic timeline of your own.

Why the deadlines arrive in waves

There is no single date from which the Digital Product Passport applies to everyone. The EU introduces it product group by product group: for each group a separate delegated act under the Ecodesign for Sustainable Products Regulation (ESPR) defines which data the passport must carry.

Two separate regimes run in parallel. The EU Battery Regulation brings the battery passport with a fixed date, and the EU Toy Regulation introduces the passport as a replacement for the declaration of conformity. If you sell both, you are planning against different legal bases at once.

Fixed or expected – why the difference matters

Only a few dates are fixed to the day. For ESPR product groups the years indicate when the delegated act is expected to take effect. The obligation only becomes binding once the act is adopted, plus a transition period of usually 18 months.

In practice: an expected year can move, the direction cannot. If you wait for the act itself, the transition period is your entire project budget – and for supply chain data collection that is usually tight.

Batteries: the first hard deadline

18 February 2027 is the only date in this overview that is fixed to the day and triggers a genuine DPP obligation. From then on every EV, industrial (over 2 kWh) and LMT battery needs a digital battery passport.

LMT stands for Light Means of Transport, which puts e-bike and e-scooter brands directly in scope. The passport must cover cell chemistry, capacity, carbon footprint, recycled content and conformity evidence, among other things.

Toys: a passport instead of a declaration

The EU Toy Regulation 2025/2509 has been adopted, and its distinctive feature is that the product passport replaces the existing declaration of conformity. For toy brands the DPP is therefore not an extra obligation but a new format for evidence they already maintain.

The requirement applies once the transition period ends, around 2030. Many manufacturers prepare earlier because their core safety documentation depends on it.

Electronics: a rollout, not a deadline

Electronics and household appliances do not enter the passport on one date but through the energy label carry-over: dishwashers from 2026, refrigeration appliances and EV chargers from 2028, smartphones and tablets from 2030.

On top of that come the ESPR's horizontal repairability requirements from 2027. For electronics manufacturers it pays to build the data structure once, cleanly, and extend it per product group.

How this checker calculates

For milestones with a fixed calendar date – the destruction ban on 19 July 2026 and the battery passport on 18 February 2027 – the countdown shows years, months and days. It is calculated once when the page loads, not ticked up second by second.

For every other milestone no exact date has been published. The checker uses 1 July of the year shown, flags that assumption visibly in the result and reports years and months only. Suggesting a day-precise deadline where none exists would be misleading.

Frequently asked questions about DPP and ESPR deadlines

When does the Digital Product Passport become mandatory?

The first hard deadline is 18 February 2027, when the battery passport becomes mandatory for EV, industrial and LMT batteries such as e-bike packs. The ESPR product groups follow in stages: textiles and tires expected from 2027, furniture from 2028, mattresses from 2029 and toys around 2030.

What does it mean when a deadline is marked as expected?

For ESPR product groups the years indicate when the relevant delegated act is expected to take effect under current EU planning. The obligation only becomes binding once that act is adopted, plus a transition period of usually 18 months. No exact calendar date exists for these groups yet.

Which DPP deadlines are already fixed?

Two dates are fixed to the day: the ban on destroying unsold textiles and footwear on 19 July 2026 (ESPR, Article 25) and the battery passport on 18 February 2027 (EU Battery Regulation 2023/1542). The EU Toy Regulation 2025/2509 has also been adopted, with its transition period running until around 2030.

When should I start preparing?

Allow 12 to 18 months before your deadline for scoping, data gap analysis and supplier communication, 6 to 12 months for collecting and validating material and origin data, and the final months for publication, QR codes and a maintenance process. Gathering evidence across the supply chain usually takes longest.

Does the DPP obligation apply to small companies too?

Yes. The obligation is tied to placing products on the EU market, not to company size. The ESPR provides support measures and in some cases longer transition periods for SMEs, but no general exemption from the product passport.

What happens if I miss the DPP deadline?

Products without the required passport may no longer be placed on the EU market after the deadline. Member state market surveillance authorities can impose sales bans and recalls; the specific penalties are set by the member states.

Deadline in sight – start building the data now

With SolveDPP you bring your catalogue into an auditable, compliant state step by step – long before the deadline starts pushing.

Find it on the Shopify App Store